Environmental
Urban Runoff Plan: Worksheet & Summary
is
required when a 50% remodel of the building is
proposed.
Treat & Release option for compliance.
Green Building Code Compliance Forms are
needed when a 50% remodel of the building is
proposed.
C&
D Waste Management Plan Form is required for
any remodel that costs over $50,000 or involves
over 1000 square foot area.
C& D
Waste Management Final Compliance Report is
required after the project is complete to obtain
a refund of the deposit .
Utilities
Application for
Water Service is required to check the meter
size any time there is plumbing in the project.
Instructions and general information for
meter sizing questionnaire.
Wastewater Capital Facility Fee Questionnaire
is required when the building area or number of
residential units is increased.
Instructions and general information for
wastewater capital facility questionnaire.
Application for Water Demand Mitigation is
required when a substantial remodel increases
the water usage.
Instructions and general information for
wastewater capital facility questionnaire.
City Properties
Application for Revocable Encroachment Permit
is required when the project includes
construction into or over the public right of
way.
Other Permit Forms
Excavation and
Shoring Plan is required to determine that
projects with excavation and shoring do not
adversely affect public rights of way and
utilities.
Right of Way
Excavation Permit Application is required by
the contractor to construct underground piping
in the public right of way.
Wireless
Facility Permit Application is required by
the contractor to construct underground piping
in the public right of way.